In more than 60 years of activities, SICES has executed several Projects, from new plant construction to turn-around, from revamping to short call assistance.
Below listed some of the most important projects executed in the last 10 years.
Plant Construction
- Heavy residue complex - Burgas
Client: Lukoil Neftochim Burgas AD
Plant Description: Heavy Residue Hydrocracking Complex
Location: Burgas, Bulgaria
Activity: General Contractor for the turn key construction of the plant (civil, electro-mechanical, plant protection).
Value: approx. 350M€
Direct manhours: 8.200.000
Period: Dec 2011 - May 2015
- New Oil Center - Tempa Rossa
Client: TECNIMONT
Plant Description: Oil Center
Location: Corleto Perticara (PZ) Italy
Activity: Mechanical erection works acting as leader in ATI
Value: approx 30 M€ (overall value)
Direct manhours: 1.400.000
Period: Jan. 2016 - May 2017
- New Oil Center - Tempa Rossa
Client: TECNIMONT
Plant Description: Oil Center
Location: Corleto Perticara (PZ) Italy
Activity: Mechanical works, reinstatement overall management support, Quality activities support
Value: approx 16 M€ (overall value)
Direct manhours: 30.000
Period: May. 2017 - Sept 2018
- New Vacuum and Flexi cooker - Elefsis Grece
Client: HELLENIC PETROLEUM
Plant Description: Vaacum & Flexy Coker
Location: Elefsis Greece
Activity: Vaacum, Flexy Coker Units Mechanical, Electrical & Instrumental Works
Value: 34,2 M€
Direct men hours: 990.000
Period: April 2010 - December 2012
- Staatsolie refinery expansion project suriname
Client: Staatsolie (National Oil Co.)
Plant Description: Expansion of Tout Lui Faut Refinery
Location: Paramaribo, Suriname
Activity: electro-mechanical works
Value: approx. 40MUSD
Direct manhours: 1.250.000
Period: July 2012 - March 2015
- LDPE plant borealis stenungsund - Sweden
Client: Tecnimont / Borealis
Plant Description: Low Density Polyethylene Plant
Location: Stenungsund - Sweden
Activity: Mechanical Works and painting
Value: 61.000.000 €
Direct manhours: approx. 1.100.000
Period: 18 months (2008 - 2009)
- EPC2 Project Exxon Mobil Refinery Antwerp - Belgium
Client: AMEC FOSTER WHEELER
Plant Description: Refinery
Location: Antwerp, Belgium
Activity: EPC2, Mechanical Works, Package 2
Value: Approx. 25 M€
Direct men hours: 180.000
Period: July 2015 - February 2018
- New Hydrocracker Plant Lotos Refinery Poland
Client: TECHNIP
Plant Description: Hydrocracker
Location: Gdansk - Poland
Activity: Mechanical, Electrical & Instrumental Works relevant to Mild Hydrocracker Complex
Value: 20 M€
Direct men hours: 670.000
Period: 2008 - December 2010
Turn Around and Revamping
- Revamping MTBE-ETBE Plant Versalis
Client: ECOFUEL (ENI GROUP)
Plant Description: MTBE
Location: Ravenna
Activity: Mechanical Erection Works and detail engineering
Value: Approx. 6,5 M€
Direct men hours: 80.000
Period: Feb. 2016 - Dec. 2016
- Fccu, Exxon Mobil Refinery Fos Sur Mer - France
Client: undisclosed - major refinery
Plant Description: Refinery FCC Unit
Location: France
Activity: Reactor and regenerator supply and Mechanical works on FCC Unit and transfer line during TA
Value: approx 14,5 M€ (incl. supply)
Direct manhours: approx. 100.000 Period: Sept. 2015 - Mar. 2017
- Fccu Sarpom Refinery Trecate - Italy
Client: SARPOM (EXXON)
Plant Description: Refinery FCC Unit
Location: Trecate, Italy
Activity: mechanical works for the turn around of the FCC unit
Value: approx 2.000.000 €
Direct manhours: 17.000
Period: 2014
- Tamoil, Collombey Switzerland
Client: TAMOIL
Plant Description: Refinery
Location: Collombey, Switzerland
Activity: spool riser replacement of the FCC unit
Value: 730.000 €
Direct manhours: 3.500
Period: 2007
- Fccu Eni Refinery Sannazzaro - Italy
Client: ENI
Plant Description: Refinery FCC Unit Location: Sannazzaro, Italy
Activity: Supply and erection of semispherical head of FCC Regenerator. Mechanical works on FCC Unit and transfer line during TA.
Value: 4M € (incl.supply)
Direct manhours: 40.000
Period: 2006
Prefabrication
- Heavy Residue Complex Burgas - Bulgaria
Client: LUKOIL Neftochim Burgas AD
Plant Description: Heavy Residue Hydrocracking Complex
Location: Burgas, Bulgaria
Activity: General Contractor for the turn key construction of the plant (civil, electro-mechanical, plant protection).
Value: inside main contract
Period: Dec 2011 - May 2015
Piping Prefabrication: 9.000 Tons
- CPAVOK 4 Ammonia Duslo - Slovakia
Client: TECHNIP ITALY
Plant Description: Ammonia Plant
Location: Sala'a - Slovakia
Activity: Mechanical Works
Value: inside main contract
Direct manhours: 940.000
Period: June 2016 - In progress
Piping prefabrication: 3.000 Tons
- STL Expantion Project Monthey - Switzerland
Client: undisclosed
Plant Description: Chemical Plant
Location: Switzerland
Activity: Mechanical Works, piping supply & prefabrication
Value: approx 8,7 M€
Direct manhours: 72.000
Period: Oct. 2015 - Mar. 2017
Piping Prefabrication: 16 Km Small Bore piping
- Revamping Slurry Plant Eni Ref. Sannazzaro - Italy
Client: ENI
Plant Description: Slurry Technology Plant - Lot M1
Location: ENI Refinery, Sannazzaro (PV)
Activity: piping prefabrication & erection, steel structures erection, equipment erection, painting
Value: approx. 40M € (overall project)
Direct manhours: approx. 1.400.000 (overall project)
Period: Nov. 2011 - Sept. 2013
Piping prefabrication: 1.900 Tons
Erected piping: 3.400 Tons
- General Service Mellitah Complex - Libya
Client: MELLITAH GAS B.V. (ENI-NOC)
Plant Description: GAS treatment and Compression Complex
Location: Mellitah, Libia
Activity: general maintenance of all Heat Exchangers of the Complex (i.e. high pressure cleaning & retubing)
Value: 4.500.000
Direct manhours: n.a.
Period: 2008-2010
- Turn Around At Isab Priolo - Italy
Client: ISAB Priolo
Plant Description: refinery - plant LOT II
Location: Priolo Gargallo IT
Activity: multidisciplinary works for the whole maintenance of the plant Lot II
Value: approx 14 M€
Direct manhours: 130.000
Period: Sept.2012 - Aug. 2013